![]() ![]() CAMDEN COUNTY AIRPORT Rehabilitation of Runway 5-23 The rehabilitation of Runway 5-23 project primarily involved the design and construction inspection of a bituminous overlay of the runway. In addition, a new reinforced concrete pipe replaced the existing deteriorated corrugated metal stormwater pipe which transverses under the runway. |
![]() ![]() FLYING W AIRPORT Runway 1-19 Rehabilitation and Widening The major components of this project at Flying W Airport included the rehabilitation and widening of Runway 1-19 as well as the design and development of a complex drainage system. |